Arte SheetsLearn. Try. Understand.

Math & Trig

Little's Law (WIP, Throughput, Cycle Time) and Takt Time formulas

Size Kanban WIP caps with Little's Law (WIP = Throughput * CycleTime) and balance production lines using Takt Time and workstation efficiency.

Little's Law for Kanban queues and Takt Time for customer-paced lines

Little’s Law relates average WIP, throughput and time in a consistently defined stable system. At throughput 24/day and time 3.5 days, average WIP is 84.

Work content divided by takt gives a theoretical minimum station count; actual task allocation may require more stations.

Lean Operations FormulaCalculationResult
Little's Law WIP24 units/day * 3.5 days84 units in WIP
Takt Time (Heartbeat Pace)420 net min / 140 daily demand3.00 min / unit
Minimum Workstations=ROUNDUP(10.5 task min / 3.0 Takt, 0)4 stations
Line Balance Efficiency %=10.5 / (4 * 3.0)87.5% (0.875)

Takt Time, workstation count, and Little's Law formulas

Subtract breaks and planned meetings from shift minutes before computing Takt Time.

=LET(takt, C2 / D2, stations, ROUNDUP(E2 / takt, 0), ROUND(E2 / (stations * takt), 4))

Little's Law implied Cycle Time (W = WIP / Throughput)

WIP/throughput gives the implied average time when the assumed throughput is maintained.

=ROUND(A2 / B2, 2)

Additional worked calculation

Using the initial example inputs:

=ROUND(C2 / D2, 2)

Additional worked calculation

Using the initial example inputs:

=ROUNDUP(E2 / (C2 / D2), 0)

Inputs and interpretation

Little’s Law relates long-run averages under a stable system definition and consistent time units. Reducing WIP does not guarantee unchanged throughput. Takt time requires positive demand and available time. Rounded work-content/takt is a theoretical lower bound on stations; precedence, indivisible tasks and variability may require more. The displayed efficiency assumes feasible allocation.

Try the example

Use the original values or change them to test your understanding.

Further reading