Doughnut Progress Ring Formula: Clamped Fill, Remainder Arc & Over-Target Guard

Prevent broken Doughnut Progress Charts when attainment exceeds 100% by clamping the unfilled remainder slice with MAX(0, 1 - Actual/Goal) instead of raw 1 - Actual/Goal.

Why naive =1 - Completion% breaks every Doughnut Gauge above 100%!

A two-slice Doughnut Progress Ring pairs Completed_Share and Unfilled_Remainder so the circle totals 100%. Beginners write Remainder = 1 - (B2 / B3), which works at 78% (0.78 fill + 0.22 grey track = 1.00) — until a rep hits 125% of quota! At 1.25, 1 - 1.25 = -0.25: Excel/spreadsheet chart engines take ABS(-0.25) = +0.25 and render a fake 20% grey "unfinished" gap on top of a 125% overachiever!

Always clamp both slices to [0, 1]: Primary_Ring_Fill = MIN(1, MAX(0, B2 / B3)) and Unfilled_Remainder = MAX(0, 1 - B2 / B3), while tracking Stretch_Surplus = MAX(0, B2 / B3 - 1) for the center KPI callout!

Attainment Scenario (Goal = 1,000)Actual (B2)Clamped Ring FillClamped Remainder Slice
In Progress (78.0%)7800.7800 (78% arc)0.2200 (22% grey arc)
Goal Met (100.0%)1,0001.0000 (Full ring)0.0000 (Zero gap)
Over-Target (125.0%)1,2501.0000 (Full ring, +25% badge)0.0000 (Prevents -0.25 ABS bug!)

Clamped Unfilled Remainder Arc Slice [0, 1]

Returns the remaining fraction to 100% and floors cleanly at 0 once B2 >= B3.

=IF(OR(B3 <= 0, B2 < 0), "Target Must Be Positive", ROUND(MAX(0, 1 - B2 / B3), 4))

Clamped Primary Completion Arc Slice [0, 1]

Caps the visual ring slice at 1.0000 while raw attainment B2/B3 drives the percentage label.

=IF(OR(B3 <= 0, B2 < 0), 0, ROUND(MIN(1, MAX(0, B2 / B3)), 4))