Calculate date overlap in days: find shared days between two bookings or projects
Count inclusive overlapping days between any two date ranges in one line using MAX(0, MIN(End1, End2) - MAX(Start1, Start2) + 1).
One formula handles partial, nested, touching, and disjoint ranges
Testing all four ways two date intervals can overlap with nested IF statements is notoriously error-prone. Instead, note that the intersection of [Start1, End1] and [Start2, End2] always begins at MAX(Start1, Start2) and ends at MIN(End1, End2).
For inclusive calendar days (where June 15 through June 20 counts as 6 days), the overlap is MIN(End1, End2) - MAX(Start1, Start2) + 1—clamped at 0 with MAX(0, ...) whenever the two ranges do not touch.
Validate that each start is no later than its end and that inputs are date-only numeric serials for the inclusive-day calculation. The boolean test below treats touching endpoints as overlapping; use strict inequalities for half-open checkout/check-in intervals.
| Start1 (A) | End1 (B) | Start2 (C) | End2 (D) | Inclusive Overlap |
|---|---|---|---|---|
| 2026-06-10 | 2026-06-20 | 2026-06-15 | 2026-06-25 | 6 days (Jun 15..20) |
| 2026-06-10 | 2026-06-20 | 2026-06-22 | 2026-06-28 | 0 days (disjoint) |
Inclusive vs hotel-night overlap
Use + 1 when both endpoints count as active days (6 days for Jun 15..Jun 20). Drop the + 1 for hotel nights or continuous timestamps where checkout on Jun 20 and check-in on Jun 20 have 0 nights of overlap.
=MAX(0, MIN(B2, D2) - MAX(A2, C2) + 1)Boolean overlap flag for conflict detection
Testing (A2 <= D2) * (C2 <= B2) > 0 returns TRUE whenever two bookings collide on at least one day.
=AND(A2 <= D2, C2 <= B2)Try the example